During 2020 in the frame of the project "Ecosystem-based adaptation, climate-resilience measures and institutional development in the Lower Dniester” implemented with the support of the Austrian Development Agency some infrastructure works have been conducted.
In Palanca based on the engineering design elaborated earlier at the expense of Palanca mayoralty, the  construction works of a part of the sewerage system (850 m) in Palanca village from Stefan Voda district, have been done. 

In order to ensure access to water for women, men and vulnerable groups from the Lower Dniester localities, in Cioburciu village (Ștefan Vodă district), a second 23m3 water reservoir was installed in addition to the existing one. The old reservoir was renovated and later consolidated together with the new one, both being connected to the water supply system of the village.

 